EMA recently published a paper at the AREMA Railway Exchange conference in Minneapolis, MN entitled: “SYSTEM LEVEL FULL SCALE LIGHTNING TESTING OF PTC WAYSIDE C&S SYSTEMS.” A summary of the paper follows: Positive Train Control requires a high degree of reliability and availability. In order to meet these requirements, CSX needed to ensure the lightning […]